Search:
Type the text to search here and press Enter.
Separate search terms by a space; they will all be searched individually in all fields of the database. Click on Search: to go to the advanced search page.
Classifieds Only: Check this box if you want to search classifieds instead of the catalog.
Please help support TroveStar. Why?

Broadway Limited - 6863 - Locomotive, Diesel, EMD F7 - Great Northern - 454A/454B

This item is not for sale. This is a reference database.
N Scale - Broadway Limited - 6863 - Locomotive, Diesel, EMD F7 - Great Northern - 454A/454B Images Courtesy of Broadway Limited Imports
Click on any image above to open the gallery with larger images.
Sell this item on TroveStar
Sell
Add a comment about this item.
It will be visible at the bottom of this page to all users.
Comment
Stock Number6863
Original Retail Price$329.99
BrandBroadway Limited
ManufacturerBroadway Limited Imports
Body StyleBroadway Limited Diesel Engine F7 (A & B Units)
Prototype VehicleLocomotive, Diesel, EMD F7 (Details)
Road or Company NameGreat Northern (Details)
Road or Reporting Number454A/454B
Paint Color(s)Orange, Brown & Yellow
Print Color(s)Yellow
Coupler TypeMT Magne-Matic Knuckle
Wheel TypeChemically Blackened Metal
Wheel ProfileSmall Flange (Low Profile)
MultipackYes
Multipack Count2
DCC ReadinessDC/DCC Dual Mode Decoder w/Sound
Announcement Date2021-05-19
Release Date2021-09-01
Item CategoryLocomotives
Model TypeDiesel
Model SubtypeEMD
Model VarietyF7A&B
Prototype RegionNorth America
Prototype EraNA Era III: Transition (1939 - 1957)
Scale1/160



Specific Item Information: Paragon4 Sound & Control System featuring ROLLING THUNDER : Unpowered B
Model Information: The F7 was the fourth model in GM-EMDs successful line of F unit locomotives, and by far the best-selling cab unit of all time. In fact, more F7s were built than all other F units combined. It succeeded the F3 model in GM-EMDs F unit sequence, and was replaced in turn by the F9. Final assembly was at GM-EMDs La Grange, Illinois plant or GMDs London, Ontario facility. The F7 differed from the F3 primarily in internal equipment (mostly electrical) and some external features. Its continuous tractive effort rating was 20% higher (e.g. 40,000 lb (18,000 kg) for an F7 with 65 mph (105 km/h) gearing, compared to 32,500 lb (14,700 kg) for an F3 with the same gearing.) A total of 2,366 cab-equipped lead A units and 1,483 cabless-booster or B units were built. (Note: the B unit is often referred to as an F7B, whereas the A unit is simply an F7. For clarity, BLI refers to A units as F7A.) Many F7s remained in service for decades, as railroads found them economical to operate and maintain. However, the locomotive was not very popular with yard crews who operated them in switching service because they were difficult to mount and dismount, and it was also nearly impossible for the engineer to see hand signals from a ground crew without leaning way outside the window. As most of these engines were bought and operated before two-way radio became standard on most American railroads, this was a major point of contention. In later years, with the advent of the road switchers such as the EMD GP7, F units were primarily used in through freight and unit train service where there was very little or no switching to be done on that line of road.
DCC Information: Paragon3 Sound & Operation System FEATURING ROLLING THUNDER
  • Operates in DC & DCC (use DCMaster for DC Sound)
  • Record & Play Operation - Records and plays back sounds and movements once or repeatedly for automatic operation
  • 16-bit Sample Rate for exceptional high frequency sound clarity
  • Alternate Whistle / Horn where applicable for locomotive with air horn and steam whistle - both the main whistle and alternate can be easily played
  • Adjustable bell ringing interval for faster or slower bell
  • Numerous user-mappable functions with available keys
  • Passenger Station Ambient Sounds - Controlled with Function Key
  • Freight Yard related radio chatter - Controlled with Function Key
  • Lumber Yard Ambient Sounds - Controlled with Function Key
  • Farm related radio chatter - Controlled with Function Key
  • Crew Radio Communications - Controlled with Function Key
  • Maintenance Yard related radio chatter - Controlled with Function Key
  • Demo Mode for display and demonstrations
  • Simple Programming with Integral DCC Decoder
  • Individually adjustable sound volumes for most effects
  • Prototype History:
    The F7 was the fourth model in GM-EMD's successful line of F unit locomotives, and by far the best-selling cab unit of all time. In fact, more F7's were built than all other F units combined. It succeeded the F3 model in GM-EMD's F unit sequence, and was replaced in turn by the F9. Final assembly was at GM-EMD's La Grange, Illinois, plant or GMD's London, Ontario, facility.

    The F7 differed from the F3 primarily in internal equipment (mostly electrical) and some external features. Its continuous tractive effort rating was 20% higher (e.g. 40,000 lb (18,000 kg) for an F7 with 65 mph (105 km/h) gearing, compared to 32,500 lb (14,700 kg) for an F3 with the same gearing.

    A total of 2,366 cab-equipped lead A units and 1,483 cabless-booster or B units were built. (Note: the B unit is often referred to as an "F7B", whereas the A unit is simply an "F7".)

    Many F7s remained in service for decades, as railroads found them economical to operate and maintain. However, the locomotive was not very popular with yard crews who operated them in switching service because they were difficult to mount and dismount, and it was also nearly impossible for the engineer to see hand signals from a ground crew without leaning way outside the window. As most of these engines were bought and operated before two-way radio became standard on most American railroads, this was a major point of contention. In later years, with the advent of the "road switchers" such as the EMD GP7, F units were primarily used in "through freight" and "unit train" service where there was very little or no switching to be done on line of road.

    From Wikipedia
    Read more on American-Rails.com
    Road Name History:
    The Great Northern was born in 1881 with the consolidation of several railroads of the northern plains under the leadership of James J. Hill. By 1893, the mainline from the Great Lakes and the Mississippi River to Seattle was complete.

    The GN had two distinctly different characters. The eastern half was a largely flat, grain producing region serving cities like Fargo, the Twin Cities, Grand Forks, Duluth, Sioux Falls, Sioux City and even Winnipeg in Canada. The east end also included the iron ore rich regions of Minnesota. Half of North Dakota was blanketed by GN branchlines (21 in all) serving every imaginable grain elevator.

    The western half is the mountainous portion that most people identify with Great Northern. This included crossing the northern Rockies and the even more difficult Cascade ranges. Cities on the western half included Billings, Butte, Helena, Havre, Spokane, Portland, Seattle, and Vancouver. In 1931, a connection to the Western Pacific was completed from Bieber north to Bend, Oregon. This line was disconnected from the rest of the Great Northern. They used trackage rights on the Oregon Trunk and SP&S to bridge the gap. The Cascade Tunnel, the longest on the continent at 7.8 miles, wasn’t completed until 1931. Construction included a massive sluiceway and hydro-electric power station to feed the electrified line through the tunnel and several miles of railroad on either side. This replaced the original Cascade Tunnel which was a third as long but 500 feet higher up the mountain. That replaced the original route that was another 700 feet higher, had 4% grades and 50 miles of snowsheds. All told, Great Northern had about 8,300 route miles.

    The steam era was especially unkind to the Great Northern. They seemed to go out of their way to make their locomotives ugly. Belpaire fire boxes were the norm (made famous by the Pennsylvania, made hideous on the GN.) Headlights were often mounted just above center giving them a spinster look. Cab fronts were often at odd angles. The tender coal bunkers were often taller than the engines. But it wasn’t just aesthetics. GN had a knack for buying the wrong engines for the job. 150 Prarie type 2-6-2’s were so unstable at speed that they were busted down to branchline duty almost straight away and none survived after about 1930. Their first 4-8-2 Mountains built for passenger and fast freight were such a disaster, they were rebuilt into 2-10-2’s. Many railroads had built Mountains out of Mikes but no one had ever started with a Mountain and had to build something else from it. The first 2-6-6-2’s were so under-powered, the boilers were used to make Mikados instead. They did manage to build the largest, fastest, and most powerful Mikados in the country however. Their articulated fleet included 2-6-6-2, 2-6-8-0 (later rebuilt into Mikes), 2-8-8-0, 2-8-8-2 types as well as a pair of Challengers originally delivered to SP&S. Many engines were dressed up with green boilers and boxcar red cab roofs.

    For the first generation of diesels, GN bought like many large railroads did: a sampling from everyone. Cab and hood units from EMD and Alco and switchers from EMD, Alco, and Baldwin populated the roster. GN’s first generation geeps and SD’s were delivered with the long hood as the front. This included their GP20’s which had high short hoods and the long hood as the front. Aside from an early black scheme for switchers, the GN fleet was delivered in Omaha Orange and green with yellow piping.

    Beginning with the arrival of GP30s in 1962, the paint scheme was simplified by dropping the bottom orange band and the yellow piping. For the second generation, General Electric replaced Alco as a supplier of new road engines.

    In 1962, some GN freight cars began to appear in Glacier Green which ran along side the vermilion paint adopted in 1956. In 1967, they went for a major shift. Sky Blue, white, and dark gray were joined by a new version of the Rocky the goat logo. There was talk that this would become the paint scheme for Burlington Northern. The GN name and logo was painted on a steel panel bolted the the hand railings of hood units, making it easier to remove after the merger. For whatever reason, they went with green, black and white, a version of which was simultaneously being tested on the Burlington Route. In 1970, Great Northern, Northern Pacific, Spokane Portland & Seattle, and Burlington Route merged to form Burlington Northern.
    Brand/Importer Information:
    Broadway Limited Imports, LLC defines itself as "the world's foremost producer of top-quality HO and N scale model trains".

    The company was founded in 2002 and introduced its first N scale model in 2009.

    Broadway Limited Imports is composed of a team of 15 fun loving individuals who are dedicated to creating the most realistic model railroading experience possible, with the best customer service possible.

    The Broadway Limited Imports headquarters is located in Ormond Beach, Florida at 9 East Tower Circle. It's just under an hour's drive from Disney World.

    About Broadway Limited Imports.
    Item created by: CNW400 on 2021-05-19 15:09:51

    If you see errors or missing data in this entry, please feel free to log in and edit it. Anyone with a Gmail account can log in instantly.